Liste des interventions
Catégorie : Outil de production / Statut : Fait / Année : 2024 / Mois : Février
Date | Détail | Utilisateurs | Temps passé | |
---|---|---|---|---|
26/02/2024 03/03/2024 | Pépinière | AW SN | 2h40 | |
19/02/2024 01/03/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h55 | |
26/02/2024 01/03/2024 | Logistique | AW AA SN | 7h40 | |
26/02/2024 29/02/2024 | Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA | 6h00 | |
29/02/2024 | 497 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA | 8h30 | |
26/02/2024 29/02/2024 | Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW SN | 0h30 | |
28/02/2024 | 500 Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 1h15 | |
27/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h30 | |
27/02/2024 | 4 Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
27/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW SN | 0h30 | |
27/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA SN | 2h00 | |
27/02/2024 | Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
26/02/2024 | Matériel | AW | 0h15 | |
26/02/2024 | Autre intervention Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h30 | |
26/02/2024 | 492 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 1h15 | |
26/02/2024 | 492 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 0h15 | |
26/02/2024 | Logistique Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
26/02/2024 | 500 Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA | 1h15 | |
21/02/2024 26/02/2024 | 500 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA | 2h15 | |
19/02/2024 25/02/2024 | Pépinière | AW AA | 2h00 | |
19/02/2024 22/02/2024 | Logistique | AW AA SN | 6h15 | |
19/02/2024 22/02/2024 | Matériel | AW | 1h15 | |
19/02/2024 22/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h45 | |
22/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h05 | |
22/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h30 | |
22/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h10 | |
22/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW | 1h15 | |
22/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 1h00 | |
15/02/2024 22/02/2024 | Pépinière Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW | 3h30 | |
21/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 1h00 | |
21/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h05 | |
21/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
20/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h05 | |
19/02/2024 20/02/2024 | 497 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA SN | 9h15 | |
20/02/2024 | 3 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 5h00 | |
20/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 1h15 | |
19/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h05 | |
19/02/2024 | Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
19/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 0h10 | |
19/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h30 | |
19/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW | 2h30 | |
12/02/2024 19/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 2h00 | |
13/02/2024 18/02/2024 | Pépinière | AW | 1h15 | |
12/02/2024 17/02/2024 | Logistique | AW AA SN | 6h10 | |
14/02/2024 16/02/2024 | Matériel | AW | 0h30 | |
13/02/2024 16/02/2024 | Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA SN | 16h00 | |
15/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
14/02/2024 | Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 0h30 | |
14/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h30 | |
14/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA | 1h45 | |
13/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 0h15 | |
10/02/2024 | Observation Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 0h20 | |
07/02/2024 10/02/2024 | Pépinière | AW | 0h45 | |
09/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 2h00 | |
09/02/2024 | Logistique Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 1h00 | |
09/02/2024 | Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW SN | 3h30 | |
29/01/2024 09/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA SN | 2h30 | |
09/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA SN | 0h35 | |
05/02/2024 09/02/2024 | Logistique | AW AA SN | 3h55 | |
09/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 1h45 | |
09/01/2024 08/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW SN | 9h15 | |
06/02/2024 08/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA SN | 1h00 | |
08/02/2024 | 500 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW SN | 2h15 | |
05/02/2024 08/02/2024 | 4 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW SN | 2h00 | |
08/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW | 0h30 | |
08/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 1h15 | |
08/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
06/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | SN | 0h30 | |
05/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA | 0h15 | |
05/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA SN | 1h35 | |
10/01/2024 05/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA SN | 6h45 | |
23/01/2024 04/02/2024 | Pépinière Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA SN | 14h30 | |
31/01/2024 02/02/2024 | 4 Terrain Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA SN | 6h30 | |
29/01/2024 02/02/2024 | Logistique | AW AA SN | 6h15 | |
30/01/2024 02/02/2024 | Hangar Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA SN | 3h30 | |
29/01/2024 01/02/2024 | Matériel Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AA SN | 0h15 | |
18/01/2024 01/02/2024 | Infrastructure de production Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus. | AW AA SN | 10h30 |