Liste des interventions

Catégorie : Outil de production / Statut : Fait / Année : 2024 / Mois : Janvier
DateDétailUtilisateursTemps passé
29/01/2024  09/02/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JK
2h30
09/01/2024  08/02/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
9h15
10/01/2024  05/02/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
6h45
23/01/2024  04/02/2024
Pépinière
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
14h30
30/01/2024  02/02/2024
Hangar
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
3h30
29/01/2024  02/02/2024
Logistique
CY
JM
JK
6h15
31/01/2024  02/02/2024
4
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
6h30
29/01/2024  01/02/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JK
0h15
18/01/2024  01/02/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
10h30
29/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h30
29/01/2024
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
0h30
29/01/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JK
0h30
24/01/2024  29/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h45
22/01/2024  26/01/2024
Logistique
CY
JM
JK
4h15
22/01/2024  26/01/2024
Hangar
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
JK
5h25
25/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h15
24/01/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
0h30
24/01/2024
Hangar
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h30
24/01/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
0h15
22/01/2024
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
JK
1h00
16/01/2024  20/01/2024
Logistique
CY
JM
3h00
17/01/2024  20/01/2024
Pépinière
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
1h15
19/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h15
18/01/2024  19/01/2024
Logistique
JK
1h00
18/01/2024
3
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h30
09/01/2024  18/01/2024
497
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
10h15
18/01/2024
4
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h15
18/01/2024
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
1h15
18/01/2024
497
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
4h30
17/01/2024
Hangar
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
2h15
09/01/2024  14/01/2024
Hangar
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JK
1h15
08/01/2024  12/01/2024
Logistique
CY
JM
JK
5h15
10/01/2024  11/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
2h45
10/01/2024
Autre intervention
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h15
09/01/2024  10/01/2024
Hangar
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
8h00
09/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
JK
3h00
08/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
0h15
08/01/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
JK
0h45
03/01/2024  05/01/2024
492
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
4h30
02/01/2024  05/01/2024
Logistique
CY
JM
4h30
04/01/2024  05/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
1h40
05/01/2024
Matériel
JM
0h30
04/01/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
0h15
03/01/2024  04/01/2024
492
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
3h50
03/01/2024  04/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
0h45
03/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
0h15
03/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
1h45
02/01/2024  03/01/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
CY
JM
2h35
02/01/2024
Terrain
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
0h45
02/01/2024
Infrastructure de production
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JM
0h15
02/01/2024
Matériel
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed non risus.
JK
0h15